Home
About Us
Project
News
Activities
Contact Us
Home
»
News
»
Maximum full tank level of TYG (2) Hydropower Plant is El-127 m
Maximum full tank level of TYG (2) Hydropower Plant is El-127 m
News
2017
Maximum full tank level of TYG (2) Hydropower Plant is El-127 m.
On 23rd August 2017, water level raised up to that Max: full tank level (El-127.12 m) at (12:45)
PM.
Hence, we opened the gated No-3 about 0.8m on that day.
News
Thaukyegat (2) Hydropower Project
22.2.2016
Power House
22.2.2016