Our Projects

Key Events

Total water spilled over spillway For Yr-2017

Total water spilled over spillway For Yr-2017

Gold Energy Company Limited
Thaukyegat(2) Hydropower Project
Total water spilled over spillway For Yr-2017 (From 23rd August to 7th November)

Read More

Summary of water spilled over spillway For Yr-2017

Summary of water spilled over spillway For Yr-2017

Summary of water spilled over spillway For Yr-2017
(From 23rd August to End of October)…

Read More

Site Visit to TYG2 Hydropower from Technological University, Thayet

Site Visit to TYG2 Hydropower from Technological University, Thayet

First and Second year of students (Electrical) and teachers from Technological University, Thayet studied a tour to TYG2 Hydropower on 17th Oct...

Read More

Involvement

Involvement

The involvement percentage of TYG (2) Hydropower plant in overall Hydropower Plants of Republic of the Union of Myanmar is as follow:…

Read More

Summary of Water Spilled over Spillway For Yr 2017

Summary of Water Spilled over Spillway For Yr 2017

SUMMARY OF WATER SPILLED OVER SPILLWAY For Yr 2017 …

Read More

Maximum full tank level of TYG (2) Hydropower Plant is El-127 m

Maximum full tank level of TYG (2) Hydropower Plant is El-127 m

News 2017  Maximum full tank level of TYG (2) Hydropower Plant is El-127 m. On 23rd August 2017, water level raised up to that Max: full tank level (El-127.12 m) at (12:45) PM. Hence, we opened the gated No-3 about 0.8m on that...

Read More