Our Projects

Key Events

Involvement

Involvement

The involvement percentage of TYG (2) Hydropower plant in overall Hydropower Plants of Republic of the Union of Myanmar is as follow:…

Read More

Summary of Water Spilled over Spillway For Yr 2017

Summary of Water Spilled over Spillway For Yr 2017

SUMMARY OF WATER SPILLED OVER SPILLWAY For Yr 2017 …

Read More

Maximum full tank level of TYG (2) Hydropower Plant is El-127 m

Maximum full tank level of TYG (2) Hydropower Plant is El-127 m

News 2017  Maximum full tank level of TYG (2) Hydropower Plant is El-127 m. On 23rd August 2017, water level raised up to that Max: full tank level (El-127.12 m) at (12:45) PM. Hence, we opened the gated No-3 about 0.8m on that...

Read More

Platwa Bridge

Platwa Bridge

TYG (2) Hydro Power has implemented the infrastructure as well as box culvert, road, schools, church, electricity supply, water tank and participated in rural development in around Project Area. Among this, Paltwa Bridge, which is 7 miles far away from TYG (2) Hydro Power, is under the reservoir area and build up the new …

Read More

Spillway & Transmission Line Maintenance

Spillway & Transmission Line Maintenance

2016 Spillway & Transmission Line...

Read More

Greening of Local Area

Greening of Local Area

2016 Greening of Local...

Read More